3DSolutions
3DSolutions
  • ABOUT US
  • WHY WE’RE HERE
  • PLANS
  • WHY CHOOSE 3DS? 
  • 3DS TEAM
  • SERVICES
  • PRODUCTION
  • REFERENCES
  • 3DS SHOP
  • NIOB PRODUCTS
  • CONTACT
  • SRBSRB

© 2026 3D SOLUTIONS. All rights reserved

Ecolab Hygiene doo Belgrade

1. Construction of hot water installation and washing system in the factory Marbo Product doo Maglić
2. Production and connection of the Stabipure system to BWM in the Heineken Novi Sad factory
3. All pipe installations made of stainless steel made in food quality
4. 20+ workers (engineers, pipe-fitters, welders, assemblers ) on site
5. Working hours: 2,500 h


KlijentEcolab Hygiene doo BelgradeUslugawww.ecolab.comGodina2022LinkWater supply and water management


  • Prev
  • References
  • Next
© 2026 3D SOLUTIONS. All rights reserved
 

Privacy Preference Center

Privacy Preferences