Messer Tehnogas AD Beograd
Production and assembly of pipe sections made of stainless steel within the project "Air Separation Plant ASU3 Bor" in DC Bor.
Pipe installations are intended for operation at extremely low temperatures (-196°C - so-called cryogenic installations), and during welding, special additional materials and welding procedures are used to preserve the necessary toughness of the material at low temperatures.
1. All pipe installations made of seamless pipes, DN015-DN350, thickness 2.77-4.78 mm
2. Radiographic and penetrant testing was performed for all pipe sections
3. 20+ workers (engineers, pipe-fitters, welders, assemblers ) on site
4. Working hours: 6,000 h
KlijentMesser Tehnogas AD BeogradGodina2022Linkwww.messer.rs