3DSolutions
3DSolutions
  • ABOUT US
  • WHY WE’RE HERE
  • PLANS
  • WHY CHOOSE 3DS? 
  • 3DS TEAM
  • SERVICES
  • PRODUCTION
  • REFERENCES
  • 3DS SHOP
  • NIOB PRODUCTS
  • CONTACT
  • SRBSRB

© 2026 3D SOLUTIONS. All rights reserved

Ecolab Hygiene doo Belgrade

Production and installation of dosing and hot water systems in the factory MARBO PRODUCT doo Bački Maglić
Production and installation of pipelines for automatic washing in the factory FRONERI ADRIATIC doo Stara Pazova
Construction and installation of pipelines for the distribution of funds in the factory IMLEK AD Padinska Skela
1. All pipe installations made of stainless steel are made in food quality
2. Total length of pipe sections 1000+ meters
3. 10+ workers (engineers, pipe-fitters, welders, assemblers ) on site
4. Working hours: 3,000 h


KlijentEcolab Hygiene doo BelgradeUslugaWater supply and water managementGodina2023Linkwww.ecolab.com


  • Prev
  • References
  • Next
© 2026 3D SOLUTIONS. All rights reserved
 

Privacy Preference Center

Privacy Preferences